MacKenzie Drive

This work was carried out shortly after our clients extension was finished. We were referred on by the the company who completed the extension as we’ve worked alongside each other many times. Due to the fresh cast we taped and covered the windows and downpipes with polythene to ensure they stay in the pristine condition they were in when we started the project. The fresh cast was given a thinned down coat which was applied with a spray unit and the previusly painted walls were given a powerwash to get rid of any dirt on the surface. The whole building was then given 2 coats of Sandtex masonary paint.